Product Detail :
|
Design, construction, supplying, testing, and commissioning of balance work of simri multi-village pipe water supply scheme (capacity 17.66 MLD) for arsenic affected villages of simri and blocks including construction of floating jetty (MS barge) structure and raw water pumping station, water treatment plant, master ESR, intermediate ESR, zonal ESR, main distribution line with DI and HDPE pipe, house service connection to each household, underground water reservoir, solar lighting system, SCADA, boundary wall, approach road, electrical/mechanical works, highway/railway/canal crossing and other allied works etc, as per direction of E/I with supply of all materials, supply and installation of all electrical and mechanical equipment and supplying, laying, jointing, testing of jointing at mislink of existing rising repair distribution pipe line of different dia including operation and maintenance for 5 years on turn-key basis with three months trial and run period and three months defects and liability after sucessful commissioning all complete job.
|